Construction Log – Monday, October 11

15 Oct
  • Cut 960 ft² of sod for where the greenhouse will go
  • Rolled it up the sod and put it on a pile
  • Filled Andrew E’s pickup bed twice (so it could be transported elsewhere)
  • Did final measurements for the greenhouse
  • Did basic pounding of 8 posts (not as far as they needed to go in, but in their proper, measured-out places)
  • Leveled soil to 6 inches from where the tops of the posts will eventually be (on the long sides of the greenhouse)
  • Picked up the building permit